<ul></ul><p>An important note to the sub tasks is, that the sub tasks has to be in the same project like the main task.<br />The project of sub tasks which belongs to another project are not changed.</p>
<p>Example:<br /><pre>
Project A
+- Sub project B
+- Sub project C
Main task (assigned to Sub project B)
+- sub task 1 (assigned to Sub project B)
+- sub task 2 (assigned to Sub project B)
+- sub task 3 (assigned to Sub project C)
</pre></p>
<p>Moving <em>Main task</em> from <em>Sub project B</em> to <em>Project A</em> moves <em>sub task 1</em> and <em>2</em> to <em>Project A</em>, too. <em>Sub task 3</em> still remains in <em>Sub project C</em>. So the result looks like:<br /><pre>
Main task (assigned to Project A)
+- sub task 1 (assigned to Project A)
+- sub task 2 (assigned to Project A)
+- sub task 3 (assigned to Sub project C)
</pre></p>
<p>But the expected result should look like:<br /><pre>
Main task (assigned to Project A)
+- sub task 1 (assigned to Sub project B)
+- sub task 2 (assigned to Sub project B)
+- sub task 3 (assigned to Sub project C)
</pre></p> Redmine - Defect #24111: Moving the parent issue from subproject to another project moves sub issues toohttps://www.redmine.org/issues/24111?journal_id=741302016-10-21T16:59:40ZJean-Philippe Langjp_lang@yahoo.fr
<ul></ul><p>Yes, it works like this by design but I understand that it may not be desirable to move subtasks too.<br />We can aither remove this behaviour (never move subtasks with parent task) or add a checkbox "Move subtasks too" when changing the project of a parent task.</p> Redmine - Defect #24111: Moving the parent issue from subproject to another project moves sub issues toohttps://www.redmine.org/issues/24111?journal_id=741532016-10-24T06:14:24ZEmanuel Reisinger
<ul></ul><p>I think it would be better to add a checkbox when moving parent task because sometimes the whole task including subtasks should be moved to another project.<br />When the checkbox means "Move subtasks too", then it should be not checked per default. This is the main behaviour in our usage.</p>