Project

General

Profile

Actions

Feature #1130

open

Work Breakdown Structure / EVM

Added by Anonymous about 16 years ago. Updated over 13 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Projects
Target version:
-
Start date:
2008-04-28
Due date:
% Done:

0%

Estimated time:
Resolution:

Description

I favor the addition of "Work breakdown structure management" to redmine.

WBS is a breakdown of the project's work into smaller pieces.
The project is decomposed in more manageable pieces, an pieces decomposed until they are work packages.

A work package can therefore be:
- assigned to a owner
- estimated

The WBS is therefore a tree where the leaves are Work packages.

For each work package it would be possible to:
- estimate the work required to complete
- assign resources
- assign a red/amber/green status
- assign actual work
- assign actual progress
- assign planned start/end date
- assign actual start/end date

In a way a WBS could be seen as a "feature" of an issue. But we here we lack the hierarchical view of the WBS.

Project network:
The wbs elements could be link to each other whilst defining the sequence for the project (predecessors successors).

To facilitate the creation of the WBS and network I would be great to be able to import information from MS Project (which makes it simple to create such structure).

Using those input, Earned Value report could be generated for the project - at different levels of the WBS.
Using all the data captured in the WBS (planned/start date - planned/spent effort) it is possible to calculate all Earned Value indicators and make a consolidated report at project level.

It would be great to also be able to link issues to WBS items (bug, support, feature).

I can offer some of my time for:
- requirements gathering
- input to UI design and data modelling
- testing
- I think my coding input would be too limited to be of help.

Merci!

Actions

Also available in: Atom PDF