DoneRatio issues overview » History » Version 10

Mischa The Evil, 2021-08-09 19:18
Add new category, and copy #11999 and move #12347 into it

1 1 Mischa The Evil
h1. DoneRatio issues overview
2 1 Mischa The Evil
3 1 Mischa The Evil
{{toc}}
4 1 Mischa The Evil
5 1 Mischa The Evil
h2. Introduction
6 1 Mischa The Evil
7 1 Mischa The Evil
This page lists an overview of open issues which are speaking specifically about changing the done ratio (@% Done@) behavior in several ways. This list could be used while managing all the issue duplicates.
8 1 Mischa The Evil
9 1 Mischa The Evil
h2. Current options for "Calculate the issue done ratio with"-setting
10 1 Mischa The Evil
11 1 Mischa The Evil
# Use the issue field (option 1)
12 1 Mischa The Evil
# Use the issue status (option 2)
13 1 Mischa The Evil
 
14 1 Mischa The Evil
h2. Issue list
15 1 Mischa The Evil
16 1 Mischa The Evil
h3. Implementation of existing "Use the issue status"-setting (option 2)
17 1 Mischa The Evil
18 1 Mischa The Evil
* Patch #4274: Use Issue status for percent done
19 1 Mischa The Evil
** Revision r3151[1], "added by Eric Davis over 3 years ago"
20 1 Mischa The Evil
21 9 Mischa The Evil
h3. Requests (and patches) for adding 3rd option "Use the logged and estimated time"
22 1 Mischa The Evil
23 1 Mischa The Evil
* Feature #952: Update % to be programatic not arbitrary
24 1 Mischa The Evil
* Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time
25 1 Mischa The Evil
* Feature #7545: Calculate the issue done ratio
26 1 Mischa The Evil
* Feature #7635: Edit % Done while logging time
27 1 Mischa The Evil
* Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
28 1 Mischa The Evil
* Feature #12762: Add option to calculate done ratio with the data from time tracking
29 1 Mischa The Evil
* Patch #13400: Calculate %done based on estimated and logged time
30 4 Mischa The Evil
* Feature #24277: Introducing Remaining Time field as method to track the remaining time to complete an issue
31 1 Mischa The Evil
32 1 Mischa The Evil
h3. Requests (and plugin) for adding 4th option "Use the issue status and field"
33 1 Mischa The Evil
34 1 Mischa The Evil
* Feature #6975: Autocalculate the issue done ratio only for certain issue status
35 1 Mischa The Evil
** "Redmine Issue Done Ratio Both plugin at GitHub":https://github.com/vaz/redmine_issue_done_ratio_both
36 1 Mischa The Evil
* Feature #11809: update progress depending on status (just default value)
37 1 Mischa The Evil
* Feature #11989: New Allow done ratios to be affected by status AND field
38 1 Mischa The Evil
* Feature #12361: Mixed done ratio calculation mode
39 1 Mischa The Evil
* Feature #20398: Use the issues field AND the issues status for issue done ratio
40 10 Mischa The Evil
41 10 Mischa The Evil
h3. Requests to turn the application setting "Calculate the issue done ratio with" into a project setting
42 10 Mischa The Evil
43 10 Mischa The Evil
* Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
44 10 Mischa The Evil
* Feature #12347: "Calculate the issue done ratio" per project configuration
45 5 Mischa The Evil
46 8 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue field"-setting (option 1) is used
47 8 Mischa The Evil
48 8 Mischa The Evil
* Defect #21449: Automatic done ratio calculation in issue tree is wrong when parent has its own estimated time
49 8 Mischa The Evil
50 5 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue status"-setting (option 2) is used
51 5 Mischa The Evil
52 5 Mischa The Evil
* Defect #6609: % Done for Parent Tasks [2]
53 1 Mischa The Evil
54 1 Mischa The Evil
h3. Requests to be able to change done ratio via commit messages (ext. #1518 and #4155)
55 1 Mischa The Evil
56 1 Mischa The Evil
* Feature #7376: Allow percent done to be updated via VCS commit message
57 1 Mischa The Evil
* Feature #9715: New Update issue done ratio from commit message 
58 1 Mischa The Evil
* Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket
59 1 Mischa The Evil
60 1 Mischa The Evil
h3. Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status)
61 1 Mischa The Evil
62 1 Mischa The Evil
* Feature #1306: New resolution fixed and % done out of sync
63 1 Mischa The Evil
* Feature #12868: status related to progress bar
64 7 Mischa The Evil
* Feature #33894: Automatically set done ratio to 100% when closing a issue
65 1 Mischa The Evil
66 1 Mischa The Evil
fn1. Commit-msg of r3151: <pre>Adds a Setting to control how an Issue's done_ratio is calculated:
67 1 Mischa The Evil
• Issue field (default) - the done_ratio field for the Issue
68 1 Mischa The Evil
• Issue status - uses the Issue Status's value 
69 1 Mischa The Evil
#4274</pre>