Project

General

Profile

DoneRatio issues overview » History » Version 10

Mischa The Evil, 2021-08-09 19:18
Add new category, and copy #11999 and move #12347 into it

1 1 Mischa The Evil
h1. DoneRatio issues overview
2
3
{{toc}}
4
5
h2. Introduction
6
7
This page lists an overview of open issues which are speaking specifically about changing the done ratio (@% Done@) behavior in several ways. This list could be used while managing all the issue duplicates.
8
9
h2. Current options for "Calculate the issue done ratio with"-setting
10
11
# Use the issue field (option 1)
12
# Use the issue status (option 2)
13
 
14
h2. Issue list
15
16
h3. Implementation of existing "Use the issue status"-setting (option 2)
17
18
* Patch #4274: Use Issue status for percent done
19
** Revision r3151[1], "added by Eric Davis over 3 years ago"
20
21 9 Mischa The Evil
h3. Requests (and patches) for adding 3rd option "Use the logged and estimated time"
22 1 Mischa The Evil
23
* Feature #952: Update % to be programatic not arbitrary
24
* Feature #3719: Automatical % Done regarding to Spent Time / Estimated Time
25
* Feature #7545: Calculate the issue done ratio
26
* Feature #7635: Edit % Done while logging time
27
* Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
28
* Feature #12762: Add option to calculate done ratio with the data from time tracking
29
* Patch #13400: Calculate %done based on estimated and logged time
30 4 Mischa The Evil
* Feature #24277: Introducing Remaining Time field as method to track the remaining time to complete an issue
31 1 Mischa The Evil
32
h3. Requests (and plugin) for adding 4th option "Use the issue status and field"
33
34
* Feature #6975: Autocalculate the issue done ratio only for certain issue status
35
** "Redmine Issue Done Ratio Both plugin at GitHub":https://github.com/vaz/redmine_issue_done_ratio_both
36
* Feature #11809: update progress depending on status (just default value)
37
* Feature #11989: New Allow done ratios to be affected by status AND field
38
* Feature #12361: Mixed done ratio calculation mode
39
* Feature #20398: Use the issues field AND the issues status for issue done ratio
40 10 Mischa The Evil
41
h3. Requests to turn the application setting "Calculate the issue done ratio with" into a project setting
42
43
* Feature #11999: Calculating issue done ratio based on "Estimated Time" and "Spent Time" - selectable by project (not globally)
44
* Feature #12347: "Calculate the issue done ratio" per project configuration
45 5 Mischa The Evil
46 8 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue field"-setting (option 1) is used
47
48
* Defect #21449: Automatic done ratio calculation in issue tree is wrong when parent has its own estimated time
49
50 5 Mischa The Evil
h3. Request for adding a fix for parent task done ratio calculation when "Use the issue status"-setting (option 2) is used
51
52
* Defect #6609: % Done for Parent Tasks [2]
53 1 Mischa The Evil
54
h3. Requests to be able to change done ratio via commit messages (ext. #1518 and #4155)
55
56
* Feature #7376: Allow percent done to be updated via VCS commit message
57
* Feature #9715: New Update issue done ratio from commit message 
58
* Feature #12815: implement commit keyword to set or to increase issue done ratio of referenced ticket
59
60
h3. Requests to automatically change done ratio to 100% when an issue is closed (assigned closed marked status)
61
62
* Feature #1306: New resolution fixed and % done out of sync
63
* Feature #12868: status related to progress bar
64 7 Mischa The Evil
* Feature #33894: Automatically set done ratio to 100% when closing a issue
65 1 Mischa The Evil
66
fn1. Commit-msg of r3151: <pre>Adds a Setting to control how an Issue's done_ratio is calculated:
67
• Issue field (default) - the done_ratio field for the Issue
68
• Issue status - uses the Issue Status's value 
69