Gantt Zoomin Depth
Added by Afonso Marques over 11 years ago
Hi,
I've just installed Redmine with the current info:
Environment:
Redmine version 2.5.2.stable
Ruby version 1.9.3-p484 (2013-11-22) [i686-linux]
Rails version 3.2.19
Environment production
Database adapter Mysql2
SCM:
Subversion 1.8.8
Git 1.9.1
Filesystem
Redmine plugins:
redmine_workload 1.0.2
I've been exploring all the bits and pieces and my stuck with one of them which is very important to me: Gantt graphs Zoomin.
As you can see from the attached image the Zoomin depth is not enough, as some of my tasks (or the ones I'd like to use Redmine for) will be divided into 0h30m or 0h15m bits. Actually the Zoomin link is not active at this particular point.
Is there any setting that I should set as a max, or min, value for zooming?
Thanks in advance.
Replies (1)
RE: Gantt Zoomin Depth
-
Added by giova giova about 11 years ago
Hello.
I'm in the same situation, i'd like to zoom until a day takes the full screen width !
Is it possible?