Project

General

Profile

Activity

From 2006-07-28 to 2006-07-30

2006-07-30

18:19 Revision 19 (svn)
Jean-Philippe Lang
14:55 Revision 18 (svn): tracker filter added on change log
Jean-Philippe Lang
12:47 Revision 17 (svn): notice messages translation
Jean-Philippe Lang
11:51 Revision 16 (svn): lang files updated
Jean-Philippe Lang
00:26 Revision 15 (svn): english and french GLoc files updated
Jean-Philippe Lang

2006-07-29

21:54 Revision 14 (svn): Localization plugin removed (replaced with GLoc)
Jean-Philippe Lang
21:53 Revision 13 (svn)
Jean-Philippe Lang
11:32 Revision 12 (svn): 0.3 unstable
Jean-Philippe Lang
11:30 Revision 11 (svn): 0.3 unstable
Jean-Philippe Lang

2006-07-28

17:08 Feature #264: due dates for issues
I think it's a good idea to add this field. It should be added
in the next release (0.3.0).
Jean-Philippe Lang
08:57 Feature #264 (Closed): due dates for issues
Hi Jean Philippe,
I would like to have a due date with the issues (for scheduling), would it fit with your plans?
...
Karim Trott
17:02 Feature #265: textarea for custom fields?
Good idea. Should be included in next release. Jean-Philippe Lang
09:01 Feature #265 (Closed): textarea for custom fields?
Is it possible to a textarea when type is string > 80 or is it possible having text as type and then in the view
a te...
Karim Trott
17:01 Feature #266: different workflows for trackers?
Hi,
I'm not sure to understand your needs.
Workflow transition are currently defined per tracker and per
role. So e...
Jean-Philippe Lang
09:04 Feature #266 (Closed): different workflows for trackers?
would be great (at least would meet my requirements ;-) if it is possible to create different workflows, which can be... Karim Trott
 

Also available in: Atom