Project

General

Profile

Actions

Patch #5591

closed

'calendar' action is used with 'issue' controller in issue/sidebar

Patch #5591: 'calendar' action is used with 'issue' controller in issue/sidebar

Added by Andrew Rudenko over 16 years ago. Updated over 16 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
UI
Target version:

Description

app/views/issues/_sidebar.rhtml still uses :controller => 'issues', :action => 'calendar' although Calendar has been moved into the separated controller.
so this patch is to use 'calendars' controller with 'show' action.


Files

calendar_refactor.patch (786 Bytes) calendar_refactor.patch Andrew Rudenko, 2010-05-25 11:34

Updated by Andrew Rudenko over 16 years ago Actions #1

sorry, forgot to add information:
  • branch: trunk (dev)
  • revision: r3750

Updated by Mischa The Evil over 16 years ago Actions #2

  • Category changed from Issues to UI
  • Assignee set to Eric Davis
  • Target version set to 1.0.1

This is a small fix which can be / should be included in 1.0.1 too imho.

Thanks for reporting this Andrew.

Updated by Eric Davis over 16 years ago Actions #3

  • Status changed from New to Resolved
  • % Done changed from 0 to 100

Fixed in r4012, thanks for finding that.

Updated by Eric Davis over 16 years ago Actions #4

  • Status changed from Resolved to Closed

Merged to 1.0-stable.

Actions

Also available in: PDF Atom