Activity
From 2007-10-15 to 2007-10-17
2007-10-17
-
05:47 Feature #459 (Closed): Add Latest Activity on My Page
- Add the option for a "Latest Activity" feature on the My Page. This would allow for easy checking on any activity
on all your related projects.
2007-10-16
-
18:50 Patch #233 (New): Per project themes patch
- I was so excited to see JP had included the ability to theme the app easily. I really wanted to be able to theme projects
independently for customer-facing projects. Here is a patch to do so. -
12:36 Defect #131: Gantt chart combo-box choice ignored on 'Apply' button press
- OK
-
04:48 Defect #131: Gantt chart combo-box choice ignored on 'Apply' button press
- I just realized I used wrong button - 'Apply' in the right
form (the one that allows you selecting issues trackers)
instead of 'Submit' button.
I think you can discard this bug. -
10:25 Defect #132 (Closed): command line arguments for SVN are not escaped
- If your username or password for the subversion repository contains (for example) a "$" you can not log in
to the repository 'cause the command line evaluates this as a shell variable.
If your password is "12$34" you have to enter "12\... -
05:48 Feature #458 (Closed): Bulk edit issues does not allow to unassign issues
- I.e. there's no empty option in 'Assigned to' combo-box.
SVN Revision: 843
2007-10-15
-
23:53 Feature #444: submit issue via email
- I think this leans towards some sort of a simple API. adding
items via a simple form on a website, or submitting via
email, you could do a lot of issue creation using different
means....
could be very useful.
thanks,
m -
21:14 Feature #444: submit issue via email
- Hi there - this feature would be helpful for us as well. Our
members submit most of our issues. This includes bugs, feature
requests, improvement suggestions and general support issues.
If there was one project called JoeBlow v2.0 - wi... -
16:30 Feature #444: submit issue via email
- hi Jean-Philippe,
more than one project, yes. each project has a dedicated
email box, so no worries about parsing out Subject lines for
specific projects.
if they want to send to a single email box, the first step
in triage withi... -
16:15 Feature #444: submit issue via email
- Do you have more than 1 project that would receive issues by
mail ? If so, what solution do you see in order to know which
project an incoming email is related to ? -
16:08 Feature #378: Extensions Connector / Repository Concept
- You can find a first plugin (simple_ci) in the repository.
You can fill other requests for additional features about
plugins. -
14:46 Defect #59: when browsing a copy in the repository, the log is not displayed
- This problem should be fixed by r843.
-
12:06 Feature #456: file dialog for repo's "Root directory"
- Hi,
Root directory is not a simple filesystem directory, you have
to specify a protocol too. And it can be on a different host
than Redmine.
Also, being able to "browse" the server's filesystem
is not a good idea IHMO. -
02:15 Feature #456 (Closed): file dialog for repo's "Root directory"
- Hi!
What do you think to provide file dialog when admin needs to configure "Root directory" for SCM repo?
Sincerely,
Gour -
12:02 Defect #131: Gantt chart combo-box choice ignored on 'Apply' button press
- Could you give more details because I can't reproduce this
problem.
Which setting exactly is ignored ? -
06:52 Defect #131 (Closed): Gantt chart combo-box choice ignored on 'Apply' button press
- SVN revision: 839
-
11:59 Defect #130: Issue editing page 'End date' shows the same date as 'Start' field contents
- Fixed in r840.
Thanks. -
06:49 Defect #130 (Closed): Issue editing page 'End date' shows the same date as 'Start' field contents
- SVN revision: 839
Reproduction rate: 100% -
11:59 Defect #129: 'Issues' table shows weird date for 'Start' and 'Due date' columns
- Fixed in r840.
Thanks. -
06:47 Defect #129 (Closed): 'Issues' table shows weird date for 'Start' and 'Due date' columns
- Symptom description:
* ~30 issues in the list (filtered by 'Open') without dates set
* 4 of them have both 'Start' and 'Due date' set to different valid dates
* Table shows '2007-10-09' in both 'Start' and 'Due date' columns for all f... -
11:52 Feature #457: file dialog for repo's "Root directory"
- Entered twice.
-
02:16 Feature #457 (Closed): file dialog for repo's "Root directory"
- Hi!
What do you think to provide file dialog when admin needs to configure "Root directory" for SCM repo?
Sincerely,
Gour