15:24 Defect #34280: How to optimize or delete old logs? It takes 30 seconds for me to create an issure.
you should use a more recent Redmine version in terms of performance and security. Redmine 3.4.6 is no longer support... Pavel Rosický
12:27 Defect #34280: How to optimize or delete old logs? It takes 30 seconds for me to create an issure.
Is there any other way besides upgrading the new version? Because there are plug-ins that do not support the new ver... li ru
12:03 Defect #34280: How to optimize or delete old logs? It takes 30 seconds for me to create an issure.
Hi,
That version of Redmine seems quite old so if possible maybe try and update it to the latest version.
Thanks
Jacob Evans
09:34 Patch #34269: Allow system tests to run on remote Selenium hub (eg: Docker)
Go MAEDA wrote:
> Committed the patch (r20428). Thank you for your contribution.
Thanks Go Maeda for fixing the R...
Marius BĂLTEANU
05:42 Defect #34297 (Confirmed): Subprojects issues are not displayed on main project when all subprojects are closed
I have confirmed the reported behavior. If there are one or more open subprojects, issues in closed subprojects are v... Go MAEDA
01:34 Defect #34297 (Closed): Subprojects issues are not displayed on main project when all subprojects are closed
No issues are displayed on issue page... huijun Kim

2020-11-22

14:47 Defect #34165 (Closed): RuboCop warns Layout/SpaceInsideBlockBraces and Layout/SpaceInsideHashLiteralBraces due to r20189 and r20190
Toshi MARUYAMA
08:19 Defect #31637: CSV and PDF export don't respect Time span format
Setting the target version to 4.2.0. Go MAEDA
07:55 Feature #34258: Create tracker by copy
Thank you for posting the patch. I think the following change to the patch is necessary to fix an issue that the sele... Go MAEDA

2020-11-21

10:45 Feature #4939: List of tasks filtered as OR and not AND