Activity
From 2018-01-22 to 2018-01-24
2018-01-24
-
20:48 Defect #22424: Change Russian translation for default_issue_status_feedback
- *Требуется ответ* or *Ожидается ответ* is same meaning as *Нужен отклик*.
I thought could me to suggest *запрос* (... -
19:16 Defect #22424: Change Russian translation for default_issue_status_feedback
- The translation *Требуется обратная связь* will have the same meaning as *Нужен отклик* in this context, but is short...
-
20:05 Feature #27877: Optimize history navigation
- In gantt and calendars you have links to go forward or back in time.
1. Don't show back or forward button/links if... -
19:19 Feature #27877 (Needs feedback): Optimize history navigation
- Please explain more details.
-
18:57 Defect #28035 (Needs feedback): Order of versions is not correctly ordered
-
18:57 Defect #28035 (New): Order of versions is not correctly ordered
-
18:57 Defect #28035 (Closed): Order of versions is not correctly ordered
- source:tags/3.4.4/app/models/version.rb#L197...
-
18:08 Defect #27863 (Confirmed): If version is closed or locked subtasks don't get copied
- Confirmed.
In the log:... -
14:02 Defect #28062: "Error 500" when creating a new task for a specific sprint
- Thank you for your guidance, Mr. MAEDA and Mr. BALTEANU. I already opened a ticket for the plugin author.
Go MAEDA... -
03:49 Defect #28062: "Error 500" when creating a new task for a specific sprint
- I glanced through the log and found the fllowing lines:...
-
13:12 Patch #28026 (Closed): "project_from_subbaddress" option is not listed in the help of "rake redmine:email:receive_imap"
- Committed.
-
09:50 Defect #22977: A project member has no access and gets no notification, when being a watcher of the issue
- Well, I see the difference between SEE and BE NOTIFIED, no doubt. What is the expected behaviour? To see (might be ex...
-
09:42 Defect #22977: A project member has no access and gets no notification, when being a watcher of the issue
- I still think SEEING the issue and being NOTIFIED on issue updates are two completely separate things. Being able to ...
-
09:49 Feature #8488: Create an 'Involve' mechanism to private issues
- +1
-
09:48 Defect #11888: No e-mail notification for non-members who are watchers
- +1
-
09:44 Defect #24061: Tickets can be watched by users who are not available in specific tracker
- Wouldn't a better solution be to
* Configure if issues should be "watchable" by users not in the selected tracker
... -
04:55 Patch #28024 (Closed): Fix typo in error message in mailer.rb
- Committed. Thank you for your contribution.
2018-01-23
-
20:00 Defect #28062: "Error 500" when creating a new task for a specific sprint
- Marius BALTEANU wrote:
> Please contact plugin author.
>
> This is the Redmine issue tracker for reporting bugs ... -
19:34 Defect #28062 (Closed): "Error 500" when creating a new task for a specific sprint
- Please contact plugin author.
This is the Redmine issue tracker for reporting bugs or feature requests about the ... -
19:30 Defect #28062 (Closed): "Error 500" when creating a new task for a specific sprint
- I am dropping into an *Internalerror 500* page when creating a new task, of type functionality for specific sprints. ...
-
13:30 Feature #5358: Share Issues Categories for sub-projects
- +1
-
12:07 Feature #1330: Copy a Wiki Page
- +1 would be very useful
-
02:50 Defect #28033: Unable to turn off "For all projects" flag of custom queries
- It is because queries with "For all projects" enabled don't have the information of its belonging project.
The att...
2018-01-22
-
15:59 Defect #26853: Fix hardcoded project-index width for webkit and mozilla browsers
- Got the same issue on a fresh install of v3.4.4-stable on Raspbian.
Anyway, here is my $0.02, after analyzing and ... -
11:23 Defect #28035 (Closed): Order of versions is not correctly ordered
- I see this with version 3.4.2 and on redmine.org at different places:
* in project configuration
* in custom fiel... -
10:54 Defect #28034 (New): Can assign closed/locked versions to custom field
- Detected in version 3.4.2.
If I create a ticket with a tracker that has a custom field of type version (trying to ... -
10:32 Defect #28033 (New): Unable to turn off "For all projects" flag of custom queries
- The "For all projects" flag of custom queries cannot be disabled if once enabled.
Steps to reproduce:
# Create a ... -
09:51 Defect #28021 (Closed): limit to 33 sub-projects
- Thank you for your feedback.
-
09:00 Defect #28021: limit to 33 sub-projects
- Toshi MARUYAMA wrote:
> There is no such limitation on Redmine.
> Try "bundle exec rails runner 'Project.rebuild_tr... -
07:36 Feature #1237: Add support for two-factor authentication
- What is the release date of 4.1.0. any tentative dates ?
-
06:28 Patch #28026: "project_from_subbaddress" option is not listed in the help of "rake redmine:email:receive_imap"
- I confirmed that the following command works properly....
Also available in: Atom